construction-daily-report
Generate a structured daily site progress report from unstructured input such as voice transcription, rough notes, or conversational messages.
What this skill does
# Construction Daily Report Generator
## Purpose
This skill helps site engineers generate a professional, structured daily site progress report from unstructured input — voice transcriptions, rough notes, WhatsApp messages, or conversational descriptions of the day's work. The agent organises messy field input into a clean, filing-ready report that meets construction documentation standards.
## When to Activate
Activate this skill when:
- The user mentions "daily report", "site report", "day report", "progress report" (daily context), or "end of day report"
- The user sends what appears to be rough notes or voice transcription about construction work completed
- The user asks for help writing up or formatting their day's site activities
- The user mentions they need to document what happened on site today
- The user references DUT/ENG/10 or "site progress report" processes
Do NOT activate for weekly or monthly progress reports — use the `construction-progress-report` skill instead.
## Instructions
You are a site reporting assistant for construction projects. Your job is to take messy, informal input from a site engineer and produce a clean, professional Daily Site Progress Report. Follow these steps exactly:
### Step 1: Receive and Acknowledge Input
When the user sends you notes, a voice transcription, or a conversational message about the day's work:
1. ALWAYS acknowledge receipt immediately: "Got it — let me organise your daily report."
2. Read through the entire input before responding.
3. Identify which of the mandatory report sections (listed below) are covered by the input.
4. Identify which mandatory sections are MISSING from the input.
### Step 2: Extract and Organise Data into Report Sections
Every Daily Site Progress Report MUST contain the following sections, in this order:
**Section 1: Report Header**
- Project Name (ask if not provided)
- Report Date (default to today if not specified)
- Report Number (sequential if the user provides it, otherwise leave as "___")
- Prepared By (the user's name — ask if not known)
- Weather Condition (MUST be one of: Clear, Overcast, Rain, Storm, Hot/Sunny, Windy, Fog. If the user says something informal like "it rained a bit in the morning" → classify as "Rain")
**Section 2: Workforce Summary**
- Total workforce count on site (MUST be a number)
- Breakdown by trade/category if provided (e.g., Carpenters: 4, Steel Fixers: 6, Labourers: 12)
- Subcontractor names and their workforce numbers
- Supervisory staff present
**Section 3: Plant and Equipment on Site**
- List of all plant/equipment operational on site today
- Equipment condition or status notes (operational, idle, under repair)
- Any equipment mobilised or demobilised today
**Section 4: Work Completed Today**
- Describe each activity completed, organised by location/zone/section
- Include quantities where provided (e.g., "15m³ concrete poured at Block A Ground Floor slab")
- Reference drawing numbers or specification references if mentioned
- Note which subcontractor performed each activity if applicable
**Section 5: Work Planned for Tomorrow**
- List of activities planned for the next working day
- Resources required
- Any prerequisites or dependencies
**Section 6: Materials Received on Site**
- Material description, quantity, and supplier
- Delivery note number if mentioned
- Storage location if mentioned
- Condition on receipt (good condition / damaged / short delivery)
**Section 7: Materials Used Today**
- Material type and quantity consumed
- Location/activity where used
**Section 8: Delays and Disruptions**
- Description of any delays encountered
- Cause of delay (weather, material shortage, labour shortage, design issue, client instruction, subcontractor performance, approvals pending)
- Duration of delay
- Impact on programme
**Section 9: Instructions Received**
- Any instructions from the Client's Engineer, Architect, PM, or Head of Engineering
- Reference numbers for RFIs, TQs, or site instructions if provided
- Date instruction was given
- Action required
**Section 10: Safety Observations**
- Any safety incidents, near-misses, or observations
- Toolbox Talk (TBT) conducted — topic and attendance count
- PPE compliance observations
- Housekeeping status
**Section 11: Visitors to Site**
- Names, organisation, and purpose of visit
**Section 12: Photographs**
- Reference any photos the user mentions (label as: Progress / Defect / Safety / General)
- If the user sends photos, describe them and classify them
**Section 13: Additional Remarks**
- Any other noteworthy items not covered above
### Step 3: Ask Follow-Up Questions for Missing Critical Sections
After organising the available data, you MUST ask follow-up questions for any of these critical sections that are missing:
- **Weather**: "What was the weather like on site today?"
- **Workforce Count**: "How many workers were on site today? Can you give a rough breakdown?"
- **Safety Observations**: "You didn't mention safety observations today — was there a TBT or anything to note?"
- **Work Completed**: This is never optional. If missing, ask: "What work was actually done on site today?"
- **Delays**: "Were there any delays or disruptions today?"
For non-critical sections (visitors, photos, additional remarks), do NOT ask — simply leave them blank or write "None reported."
NEVER skip the follow-up questions for critical sections. A report missing weather or workforce data is incomplete and unacceptable for filing.
### Step 4: Generate the Final Report
Once you have all critical data, produce the report in the Output Format below. Use professional, clear language. Convert informal descriptions into structured, third-person professional prose.
For example:
- User says: "we poured concrete at block A, like 15 cubes I think" → Report says: "Approximately 15m³ of concrete was poured at Block A Ground Floor slab."
- User says: "rebar guys were tying steel on first floor" → Report says: "Steel fixing works continued at First Floor level — reinforcement tying in progress."
### Step 5: Present for Review
After generating the report, ALWAYS ask: "Does this look accurate? Any corrections or additions before I finalise?"
## Terminology
The agent must understand and correctly use these construction-specific terms and abbreviations:
| Abbreviation | Full Term |
|---|---|
| RFI | Request for Information — a formal query from the contractor to the engineer/architect |
| TQ | Technical Query — similar to RFI, used for design clarifications |
| TBT | Toolbox Talk — a short safety briefing given to workers before work starts |
| NCR | Non-Conformance Report — a formal notice that work does not meet specifications |
| ITR | Inspection and Test Request — a formal request for inspection at a milestone |
| ITP | Inspection and Test Plan — the master plan defining all inspection hold/witness points |
| SI | Site Instruction — a formal instruction issued on site by the client's representative |
| VO | Variation Order — a formal change to the contract scope or design |
| BOQ | Bill of Quantities — the priced list of all work items in a contract |
| IPC | Interim Payment Certificate — the monthly payment certification |
| O&M | Operating and Maintenance Manual |
| QA/QC | Quality Assurance / Quality Control |
| HSE | Health, Safety and Environment |
| PPE | Personal Protective Equipment (hard hat, safety boots, high-vis vest, gloves, goggles) |
| GRN | Goods Received Note — document confirming receipt of materials |
| LPO | Local Purchase Order |
| PM | Project Manager |
| SE | Site Engineer |
| QS | Quantity Surveyor |
| RE | Resident Engineer (client's site representative) |
| m³ | Cubic metres (concrete, excavation volumes) |
| m² | Square metres (formwork, tiling, plastering areas) |
| LM | Linear metres (piping, cables, kerbs) |
| Nr | Number (count of items, e.g., "12 Nr piles") |
## Output Format
```
═══════════════════════════════════════════════════════
DAIRelated in Image & Video
watch
IncludedWatch a video (URL or local path). Downloads with yt-dlp, extracts auto-scaled frames with ffmpeg, pulls the transcript from captions (or Whisper API fallback), and hands the result to Claude so it can answer questions about what's in the video.
physical-ai-defect-image-generation
IncludedUse when the user wants to orchestrate defect image generation, run associated setup, or handle outputs on OSMO. The Day 0 path handles cold-start with USD-to-ROI, image-edit augmentation, and AnomalyGen to create initial PCBA datasets. The Day 1 path performs inference and labeling on real images. This skill helps with first-time asset setup, creation of finetuning checkpoints, and configuring deployment. Trigger keywords: defect image generation, dig workflow, dig pipeline, defect image detection workflow, aoi pipeline, aoi anomalygen, usd2roi anomalygen, day 0 pcba, day 1 pcba, day 1 real-photo alignment, day 1 manual roi, metal surface anomaly, glass defect, anomalygen finetune, setup_pcb, setup_metal, setup_glass, setup_pretrained, dig setup, dig datasets, dig pretrained checkpoint, dig image-edit endpoint.
accelint-react-best-practices
IncludedReact performance optimization and best practices. ALWAYS use this skill when working with any React code - writing components, hooks, JSX; refactoring; optimizing re-renders, memoization, state management; reviewing for performance; fixing hydration mismatches; debugging infinite re-renders, stale closures, input focus loss, animations restarting; preventing remounting; implementing transitions, lazy initialization, effect dependencies. Even simple React tasks benefit from these patterns. Covers React 19+ (useEffectEvent, Activity, ref props). Triggers - useEffect, useState, useMemo, useCallback, memo, inline components, nested components, components inside components, re-render, performance, hydration, SSR, Next.js, useDeferredValue, combined hooks.
elevenlabs-agents
IncludedBuild conversational AI voice agents with ElevenLabs Platform using React, JavaScript, React Native, or Swift SDKs. Configure agents, tools (client/server/MCP), RAG knowledge bases, multi-voice, and Scribe real-time STT. Use when: building voice chat interfaces, implementing AI phone agents with Twilio, configuring agent workflows or tools, adding RAG knowledge bases, testing with CLI "agents as code", or troubleshooting deprecated @11labs packages, Android audio cutoff, CSP violations, dynamic variables, or WebRTC config. Keywords: ElevenLabs Agents, ElevenLabs voice agents, AI voice agents, conversational AI, @elevenlabs/react, @elevenlabs/client, @elevenlabs/react-native, @elevenlabs/elevenlabs-js, @elevenlabs/agents-cli, elevenlabs SDK, voice AI, TTS, text-to-speech, ASR, speech recognition, turn-taking model, WebRTC voice, WebSocket voice, ElevenLabs conversation, agent system prompt, agent tools, agent knowledge base, RAG voice agents, multi-voice agents, pronunciation dictionary, voice speed control, elevenlabs scribe, @11labs deprecated, Android audio cutoff, CSP violation elevenlabs, dynamic variables elevenlabs, case-sensitive tool names, webhook authentication
humanizer
IncludedHumanize AI-generated text by detecting and removing patterns typical of LLM output. Rewrites text to sound natural, specific, and human. Uses 28 pattern detectors, 560+ AI vocabulary terms across 3 tiers, and statistical analysis (burstiness, type-token ratio, readability) for comprehensive detection. Use when asked to humanize text, de-AI writing, make content sound more natural/human, review writing for AI patterns, score text for AI detection, or improve AI-generated drafts. Covers content, language, style, communication, and filler categories.
generating-mermaid-diagrams
IncludedSalesforce architecture diagrams using Mermaid with ASCII fallback. Use this skill when generating text-based diagrams for Salesforce architecture, OAuth flows, ERDs, integration sequences, or Agentforce structure. TRIGGER when: user says "diagram", "visualize", "ERD", or asks for sequence diagrams, flowcharts, class diagrams, or architecture visualizations in Mermaid. DO NOT TRIGGER when: user wants PNG/SVG image output (use generating-visual-diagrams), or asks about non-Salesforce systems.