Maintenancepm
Preventive maintenance schedules for MNMUK machine shop equipment. Covers DMG MORI, CITIZEN, MITSUBISHI EDM, Haas, and support equipment. USE WHEN user asks 'PM schedule', 'maintenance', 'service due', 'machine maintenance', 'what maintenance', or 'TPM checklist'.
What this skill does
# MaintenancePM - Preventive Maintenance System **Purpose:** Protect capital equipment investment through systematic preventive maintenance. ## When to Activate - "What's the PM schedule for NLX2500?" - "Create maintenance checklist" - "What's due for service?" - "TPM checklist for Swiss machines" - "Maintenance history for [machine]" - "PM planning" --- ## Maintenance Philosophy ### Total Productive Maintenance (TPM) | Level | Responsibility | Frequency | Examples | |-------|---------------|-----------|----------| | **Operator** | Daily/Shift | Every shift | Cleaning, lubrication, visual checks | | **Technician** | Weekly/Monthly | Scheduled | Filter changes, calibration, adjustments | | **Specialist** | Quarterly/Annual | Planned | Major service, rebuilds, alignments | | **OEM** | As required | Scheduled | Warranty service, major repairs | --- ## DMG MORI Machines ### Daily Checks (Operator - Every Shift) ```markdown # Daily PM Checklist - DMG MORI Machine: _____________ Date: _________ Operator: _________ ## Start of Shift | Check | OK | Issue | Notes | |-------|-----|-------|-------| | Coolant level | ☐ | ☐ | | | Coolant concentration (refractometer) | ☐ | ☐ | Target: ___% | | Hydraulic oil level | ☐ | ☐ | | | Way lube level | ☐ | ☐ | | | Air pressure (6 bar min) | ☐ | ☐ | | | Chip conveyor clear | ☐ | ☐ | | | Guards/doors function | ☐ | ☐ | | | No unusual noises | ☐ | ☐ | | | Spindle warm-up complete | ☐ | ☐ | | ## End of Shift | Task | Done | Notes | |------|------|-------| | Clean machine exterior | ☐ | | | Remove chips from work area | ☐ | | | Wipe down way covers | ☐ | | | Return tools to crib | ☐ | | | Report any issues | ☐ | | Signature: _____________ ``` ### Weekly PM - DMG MORI Mills (NMV3000, DMU50, NHX500) ```markdown # Weekly PM - DMG MORI 5-Axis Mill Machine: _____________ Week: _________ Tech: _________ | Task | Done | Reading/Notes | |------|------|---------------| | Check spindle runout | ☐ | TIR: ___μm (max 5μm) | | Inspect tool changer | ☐ | | | Clean coolant tank strainer | ☐ | | | Check way lube distribution | ☐ | | | Inspect pallet changer (if equipped) | ☐ | | | Verify probe calibration | ☐ | | | Check air dryer/filter | ☐ | | | Inspect chip conveyor belt | ☐ | | | Check hydraulic filter indicator | ☐ | | | Clean control cabinet filter | ☐ | | ## Pallet System (NMV3000/DMU50) | Task | Done | Notes | |------|------|-------| | Check pallet locating surfaces | ☐ | | | Verify pallet clamping | ☐ | | | Lubricate pallet transfer | ☐ | | Issues Found: ___________________________________ Action Taken: ___________________________________ ``` ### Weekly PM - DMG MORI Lathes (NLX2500, ALX2000) ```markdown # Weekly PM - DMG MORI Turning Centre Machine: _____________ Week: _________ Tech: _________ | Task | Done | Reading/Notes | |------|------|---------------| | Check chuck clamping pressure | ☐ | Main: ___bar Sub: ___bar | | Inspect turret indexing | ☐ | | | Check tailstock alignment (if used) | ☐ | | | Verify bar feeder operation | ☐ | | | Clean chip conveyor | ☐ | | | Check coolant nozzle positioning | ☐ | | | Inspect sub-spindle (NLX2500) | ☐ | | | Verify tool sensor operation | ☐ | | | Check hydraulic pressure | ☐ | ___bar | | Clean/replace coolant filter | ☐ | | Live Tooling Check: | Task | Done | Notes | |------|------|-------| | Check live tool runout | ☐ | TIR: ___μm | | Lubricate live tool holders | ☐ | | | Verify C-axis indexing | ☐ | | ``` ### Monthly PM - All DMG MORI ```markdown # Monthly PM - DMG MORI Machine: _____________ Month: _________ Tech: _________ ## Lubrication | Task | Done | Notes | |------|------|-------| | Check/top up way lube reservoir | ☐ | Level: ___% | | Verify lube pump operation | ☐ | | | Grease linear guide wipers | ☐ | | | Lubricate ball screws (if manual) | ☐ | | ## Hydraulics | Task | Done | Notes | |------|------|-------| | Check hydraulic oil level | ☐ | | | Inspect for leaks | ☐ | | | Check pressure gauge accuracy | ☐ | | ## Coolant System | Task | Done | Notes | |------|------|-------| | Clean coolant tank thoroughly | ☐ | | | Replace coolant filters | ☐ | | | Check pump operation | ☐ | | | Verify through-spindle pressure | ☐ | ___bar | ## Electrical | Task | Done | Notes | |------|------|-------| | Clean control cabinet (air blow) | ☐ | | | Check fan operation | ☐ | | | Inspect cables for damage | ☐ | | ## Accuracy Check | Measurement | Spec | Actual | Pass | |-------------|------|--------|------| | Spindle runout | <5μm | | ☐ | | Axis backlash X | <5μm | | ☐ | | Axis backlash Y | <5μm | | ☐ | | Axis backlash Z | <5μm | | ☐ | ``` ### Annual PM - DMG MORI | Task | Interval | Last Done | Next Due | Notes | |------|----------|-----------|----------|-------| | Ball screw inspection | Annual | | | OEM or trained tech | | Spindle bearing check | Annual | | | Vibration analysis | | Geometric alignment | Annual | | | Laser or ballbar | | Hydraulic oil change | Annual/2000hr | | | | | Way lube oil change | Annual | | | | | Coolant full change | 6 months | | | | | Encoder battery | 2 years | | | CRITICAL | | Control backup | Annual | | | | --- ## HARDINGE Precision Lathe ### Daily - Operator ```markdown # Daily PM - HARDINGE | Check | OK | Issue | |-------|-----|-------| | Spindle warm-up (20 min) | ☐ | ☐ | | Collet/chuck cleanliness | ☐ | ☐ | | Coolant level and temp | ☐ | ☐ | | Air pressure | ☐ | ☐ | | No unusual vibration | ☐ | ☐ | ``` ### Weekly - Precision Checks ```markdown # Weekly PM - HARDINGE | Task | Done | Reading | |------|------|---------| | Spindle runout check | ☐ | TIR: ___μm (max 2μm) | | Temperature log start/end | ☐ | Start: ___°C End: ___°C | | Collet concentricity | ☐ | TIR: ___μm | | Sub-spindle alignment | ☐ | | ``` --- ## CITIZEN Swiss Machines ### Daily - Operator ```markdown # Daily PM - CITIZEN Swiss Machine: [ ] Laser Head [ ] LFV Date: _________ Operator: _________ | Check | OK | Issue | Notes | |-------|-----|-------|-------| | Oil level | ☐ | ☐ | | | Oil temperature | ☐ | ☐ | Target: 25-30°C | | Guide bushing condition | ☐ | ☐ | | | Bar stock quality | ☐ | ☐ | | | Chip evacuation | ☐ | ☐ | | | Air pressure (5 bar) | ☐ | ☐ | | | Mist collector filter | ☐ | ☐ | | | Part catcher clear | ☐ | ☐ | | ``` ### Weekly - Swiss Specific ```markdown # Weekly PM - CITIZEN Swiss | Task | Done | Notes | |------|------|-------| | Clean guide bushing area | ☐ | | | Check guide bushing wear | ☐ | | | Inspect collet condition | ☐ | | | Verify gang tool alignment | ☐ | | | Check back-working tools | ☐ | | | Clean oil filter | ☐ | | | Verify LFV operation (if equipped) | ☐ | | | Check laser alignment (if equipped) | ☐ | | | Inspect bar feeder | ☐ | | | Check sub-spindle pickup | ☐ | | Oil Analysis (Monthly): | Parameter | Spec | Actual | Pass | |-----------|------|--------|------| | Contamination | <NAS 8 | | ☐ | | Water content | <0.1% | | ☐ | | Viscosity | ±10% | | ☐ | ``` ### Monthly - CITIZEN | Task | Done | Notes | |------|------|-------| | Full oil tank clean | ☐ | | | Replace oil filter element | ☐ | | | Guide bushing replacement (if worn) | ☐ | | | Check Z-axis gibs | ☐ | | | Verify spindle accuracy | ☐ | | | Clean electrical cabinet | ☐ | | --- ## MITSUBISHI EDM ### Daily - Wire EDM ```markdown # Daily PM - MITSUBISHI Wire EDM Date: _________ Operator: _________ | Check | OK | Issue | |-------|-----|-------| | Dielectric level | ☐ | ☐ | | Dielectric conductivity | ☐ | ☐ | Reading: ___μS | | Wire path clear | ☐ | ☐ | | Filter pressure | ☐ | ☐ | | Wire guides condition | ☐ | ☐ | | Flushing nozzles clear | ☐ | ☐ | | Wire tension | ☐ | ☐ | | Auto-threader operation | ☐ | ☐ | ``` ### Daily - Spark EDM ```markdown # Daily PM - MITSUBISHI Spark EDM Date: _________ Operator: _________ | Check | OK | Issue | |-------|-----|-------| | Dielectric level | ☐ | ☐ | | Dielectric clarity | ☐ | ☐ | | Filter condition | ☐ | ☐ | | Electrode holder clean | ☐ | ☐ | | Flush pump operation | ☐ | ☐ | | Fire suppression OK | ☐ | ☐ | ```
Related in Code Review
gstack
IncludedFast headless browser for QA testing and site dogfooding. Navigate pages, interact with elements, verify state, diff before/after, take annotated screenshots, test responsive layouts, forms, uploads, dialogs, and capture bug evidence. Use when asked to open or test a site, verify a deployment, dogfood a user flow, or file a bug with screenshots. (gstack)
startup-due-diligence
IncludedLegal due diligence review for seed-stage and Series A startups (US, Delaware C-Corp focus). Supports both investor and founder perspectives. Capabilities include: (1) Interactive document review and issue spotting; (2) Document request list generation; (3) Cap table and SAFE/convertible note analysis; (4) Red flag identification with severity ratings; (5) Diligence report generation. TRIGGERS: due diligence, DD, startup investment, cap table review, Series A, seed round, investor diligence, legal review startup, SAFE analysis, convertible note, 409A, founder vesting.
interview-master
IncludedThis skill should be used when the user asks to "generate interview questions", "prepare for interview", "optimize resume", "conduct mock interview", "analyze git commits for resume", "generate resume from code", "review my resume", or mentions interview preparation, career assistance, or extracting project experience from git history. Provides comprehensive interview and career development guidance for both job seekers and interviewers.
fix-issue
IncludedFixes GitHub issues using parallel analysis agents for root cause investigation, code exploration, and regression detection. Reads issue context from gh CLI, searches codebase and memory for related patterns, generates a fix with tests, and links the resolution back to the issue via PR. Includes prevention analysis to avoid recurrence. Use when debugging errors, resolving regressions, fixing bugs, or triaging issues.
sf-apex
IncludedGenerates and reviews Salesforce Apex code with 150-point scoring. TRIGGER when: user writes, reviews, or fixes Apex classes, triggers, test classes, batch/queueable/schedulable jobs, or touches .cls/.trigger files. DO NOT TRIGGER when: LWC JavaScript (use sf-lwc), Flow XML (use sf-flow), SOQL-only queries (use sf-soql), or non-Salesforce code.
swift-development
IncludedComprehensive Swift development for building, testing, and deploying iOS/macOS applications. Use when Claude needs to: (1) Build Swift packages or Xcode projects from command line, (2) Run tests with XCTest or Swift Testing framework, (3) Manage iOS simulators with simctl, (4) Handle code signing, provisioning profiles, and app distribution, (5) Format or lint Swift code with SwiftFormat/SwiftLint, (6) Work with Swift Package Manager (SPM), (7) Implement Swift 6 concurrency patterns (async/await, actors, Sendable), (8) Create SwiftUI views with MVVM architecture, (9) Set up Core Data or SwiftData persistence, or any other Swift/iOS/macOS development tasks.