Claude
Skills
Sign in
Back

Manufacturingdemo

Included with Lifetime
$97 forever

Demo manufacturing knowledge base for Taylored Systems. Shows how tribal knowledge gets captured and made queryable. USE WHEN user wants a manufacturing demo OR demonstrating to potential clients OR asks about CNC setup, machine error codes, quality inspection, startup procedures, troubleshooting, or safety OR says 'manufacturing demo', 'show me an example', 'how does it work', 'Taylored Systems demo'.

General

What this skill does


# Manufacturing Operations Knowledge Base

**Company:** Demo Manufacturing Ltd (Example)
**Last Updated:** 2026-01-11
**Knowledge Source:** Captured from shop floor experts
**Powered by:** Taylored Systems — turning tribal knowledge into queryable AI

This demonstrates how **Taylored Systems** turns expert experience into queryable, AI-accessible tribal knowledge — your team's know-how, instantly searchable. Taylored Systems captures the unwritten expertise that lives in your team's heads and makes it available to every operator, every shift, instantly.

---

## Workflow Routing

This skill answers queries directly from its embedded knowledge base. Route to the relevant section based on query type:

| Query Type | Keywords | Section |
|------------|----------|---------|
| **CNC Setup** | "set up", "speeds", "feeds", "aluminium", "steel", "tooling" | §1: CNC Machine Setup |
| **Quality Control** | "inspection", "first-off", "CMM", "tolerance", "reject", "incoming" | §2: Quality Control |
| **Machine Errors** | "error code", "E-47", "alarm", "fault", "not working" | §3: Machine Error Codes |
| **Startup/Shutdown** | "morning", "startup", "checklist", "end of shift", "daily" | §4: Daily Startup |
| **Safety** | "PPE", "safety", "emergency", "fire", "injury", "accident" | §5: Safety |
| **Troubleshooting** | "problem", "chatter", "oversize", "rough finish", "tool breakage" | §6: Troubleshooting |

## Examples

**Example 1: New operator setup question**
```
User: "How do I set up the CNC for aluminium?"
→ Routes to §1.1 (Aluminium Setup, Haas VF-2)
→ Returns step-by-step: torque spec (45 Nm), work offset procedure, speed/feed tables
→ Includes Dave's tribal tip: 7075 needs 20% speed reduction vs 6061
```

**Example 2: Machine fault diagnosis**
```
User: "Machine 3 is showing error code E-47, what do I do?"
→ Routes to §3.1 (Haas VF-2 Error Codes)
→ Returns: Spindle overload — stop program, check chip pack/dull tool/excessive DOC
→ Includes escalation path: Maintenance Ext 247
```

**Example 3: Client demo of the system**
```
User: "Show me how this works — I'm a potential customer"
→ Presents knowledge base overview and "How To Use This Skill" section
→ Demonstrates how expert knowledge (Dave's 30 years, Sarah's QC insight) is captured and searchable
→ Explains: in your real system, all content comes from YOUR team's actual procedures
```

---

## How To Use This Skill

This demonstrates how Taylored Systems captures and structures manufacturing knowledge. Staff can ask natural questions like:

- "How do I set up the CNC for aluminium?"
- "What's the inspection process for incoming materials?"
- "Machine 3 is showing error code E-47, what do I do?"
- "New starter here - what's the morning startup procedure?"

The AI returns YOUR company's actual procedures, not generic internet answers.

---

## 1. CNC Machine Setup Procedures

### 1.1 Aluminium Setup (Haas VF-2)

**Before you start:**
- Check job card for material spec (6061-T6 vs 7075 - DIFFERENT SPEEDS)
- Verify tooling is correct for the job
- Ensure coolant level is above MIN line

**Setup steps:**

1. **Load material**
   - Use soft jaws for finished surfaces
   - Torque to 45 Nm - no more (Dave's tip: "finger tight plus quarter turn")
   - Check runout with dial indicator - must be <0.02mm

2. **Set work offset**
   - Touch off X, Y from datum hole
   - Z from top of stock - LEAVE 0.5mm safety margin
   - Double-check G54 values before running

3. **Speed and feed for 6061-T6**
   | Operation | Speed (RPM) | Feed (mm/min) | DOC (mm) |
   |-----------|-------------|---------------|----------|
   | Roughing | 8000 | 2000 | 3.0 |
   | Finishing | 10000 | 1500 | 0.5 |
   | Drilling | 4000 | 800 | - |

4. **Speed and feed for 7075-T6** (harder - reduce by 20%)
   | Operation | Speed (RPM) | Feed (mm/min) | DOC (mm) |
   |-----------|-------------|---------------|----------|
   | Roughing | 6500 | 1600 | 2.5 |
   | Finishing | 8000 | 1200 | 0.5 |
   | Drilling | 3200 | 650 | - |

5. **First part checks**
   - Run at 50% feed override first cycle
   - Stop after roughing, measure critical dims
   - Only go full speed after first part approved

**Common mistakes:**
- Running 7075 at 6061 speeds → tool breakage
- Forgetting coolant → surface finish issues
- Not checking runout → parts out of tolerance

---

### 1.2 Steel Setup (Haas VF-2)

**Critical difference from aluminium:** Lower speeds, higher rigidity needed

**Setup steps:**

1. **Material check**
   - Mild steel (1018/1020): Standard setup
   - 4140: Pre-heat treated? Check hardness first
   - Stainless (304/316): COMPLETELY different - see section 1.3

2. **Speed and feed for mild steel**
   | Operation | Speed (RPM) | Feed (mm/min) | DOC (mm) |
   |-----------|-------------|---------------|----------|
   | Roughing | 3000 | 800 | 2.0 |
   | Finishing | 4000 | 600 | 0.3 |
   | Drilling | 1500 | 200 | - |

3. **Tooling notes**
   - Use coated carbide (TiAlN) not HSS
   - Check insert condition - steel kills worn inserts fast
   - Minimum stickout on endmills

**Dave's wisdom:** "If it's squealing, you're going too fast. If it's rubbing, you're going too slow. Sweet spot is a nice consistent hiss."

---

## 2. Quality Control Procedures

### 2.1 Incoming Material Inspection

**Every delivery must be checked before going to stock.**

**Step 1: Paperwork check**
- [ ] Mill cert matches PO material spec
- [ ] Heat/batch numbers recorded
- [ ] Quantity matches delivery note

**Step 2: Visual inspection**
- [ ] No visible damage, corrosion, contamination
- [ ] Protective packaging intact
- [ ] Correct size/form (bar, plate, tube)

**Step 3: Dimensional check (sample)**
- Measure 3 pieces per batch (or 10% if <30 pieces)
- Check OD/thickness against spec
- Record on incoming inspection form

**Step 4: Material verification (if critical)**
- PMI test for stainless/alloy steel
- Hardness test if heat treatment specified
- Record results on cert

**Reject if:**
- Material doesn't match cert
- Dimensions outside tolerance
- Visible defects
- Missing paperwork (quarantine until resolved)

**Where to log:** Incoming Inspection Register (blue folder, QC office)

---

### 2.2 In-Process Inspection

**First-off inspection (MANDATORY):**
- 100% dimensional check against drawing
- Sign-off by setter AND operator
- Keep first-off part until batch complete

**Patrol inspection:**
- Every 20 parts OR every hour, whichever is sooner
- Check 3 critical dimensions (marked on drawing)
- Record on SPC chart if applicable

**What to do if out of tolerance:**
1. STOP machine immediately
2. Quarantine suspect parts (red bin)
3. Inform supervisor
4. Check last good part - when did drift start?
5. Measure tool wear
6. Adjust and re-validate with new first-off

---

### 2.3 Final Inspection

**Before parts leave:**

- [ ] All dimensions per drawing (CMM report for complex parts)
- [ ] Surface finish check (comparator or profilometer)
- [ ] Visual inspection - no burrs, scratches, handling marks
- [ ] Quantity count matches job card
- [ ] Parts cleaned and preserved
- [ ] Paperwork complete (job card, inspection report, any NCRs)

**Sign-off required by:** QC Inspector (or supervisor if QC unavailable)

---

## 3. Machine Error Codes

### 3.1 Haas VF-2 Common Errors

| Code | Meaning | What To Do |
|------|---------|------------|
| **E-47** | Spindle overload | Stop program. Check for chip pack, dull tool, or excessive DOC. Reduce load and restart. |
| **E-52** | Servo overload (axis) | Check for crash or obstruction. Power cycle. If persists, call maintenance. |
| **E-91** | Low coolant | Top up coolant tank. Check for leaks. |
| **E-102** | Tool not clamped | Clean taper, check drawbar. Try re-clamping. If persists, check retention knob. |
| **E-200** | Emergency stop | Check all E-stops. Reset and restart. |
| **E-310** | Encoder error | Power cycle machine. If persists, call Haas service. |

### 3.2 Before Calling Maintenance

Try these first:
1. Note exact error code and w

Related in General