# Navigating the Product and Design Jira Process

This skill grounds Jira moves in the design team's current practice for plugging into
engineering's Jira workflow. The goal: keep design decisions visible alongside the
engineering work — without maintaining a parallel design tracker. Designs are attached
directly to the engineering tickets they belong to, and everything substantive (30/60/90
critique iterations, copy, annotations) lives in Figma.

> **A note on status names below.** Jira status labels appear here in the same casing Jira
> uses them — `IN DESIGN`, `IN PROGRESS`, `DONE`, `DESIGN NEEDED`, `Ready for Dev`. Copy them
> verbatim when transitioning tickets.

## The structural rule

**Designs are attached directly to tickets.** The Figma file lives in the engineering Epic's
"Design" field (or, for one-off engineering stories, in the story's "Design" field). There is
no parallel design project, no parallel design Kanban, and no per-stage design tasks.

That's the design-team-Jira insight in one sentence. Everything else is choreography around
this rule.

## Epic-driven flow

### Initial setup

- A PM creates at least one Epic to accompany every Product Initiative document they're
  working on.
- PM assigns the Epic to the designated designer.

### In Design

- Designer (or PM) moves the Epic to `IN DESIGN`.
- Designer runs the 30/60/90 critique cadence **in Figma** — no separate Jira tasks per stage.
  Stage iterations, attached materials (stakeholder presentations, research), and
  cross-iteration feedback all live in the Figma file alongside the work.

### Design Done

- In Figma, group final designs on a single page with named Sections for each story-level
  surface.
- Designer links the Figma file in the Epic's "Design" field.
- Designer marks Figma sections as **"Ready for Dev"**.
- EM moves the Epic to `Ready for Dev` to signal engineering can pick the work up. (Some
  teams have automation that handles this; treat it as the EM's responsibility for now.)

### Engineering technical breakdown

- When engineering creates stories during technical breakdown, designer + PM + the engineer
  doing the breakdown together review the stories.
- For each story, ensure the correct Figma section is linked and that the section's content
  is **only** about that story. One-to-one mapping.

### In Progress (and dev support)

- PM or EM moves the Epic to `IN PROGRESS` when development starts.
- PM/EM creates a dev-support task titled `[project name] - dev support`, assigns it to the
  project's designer, and links it as "relates to" all engineering stories needing design
  support. (This convention persists for now even as other separate-design-task work has
  retired.)
- The task lets the designer know when their project enters development and represents the
  misc support needed throughout.
- When the last engineering task is done, the dev-support task is also marked `DONE`.

## One-off engineering stories

Some stories aren't tied to an epic — common on the UI Foundation team. The flow is shorter:

- An engineering story is created outside an epic; PM or EM realizes design support is needed.
  (Or: a designer working on a component improvement for UIF creates the story themselves.)
- PM or EM moves the story to `DESIGN NEEDED` and assigns it to the feature team's designer.
- Designer does the design work in Figma. No separate design task is created.
- When the design is complete, the designer:
  1. Links the Figma file to the story's "Design" field.
  2. Unassigns themselves from the story.
  3. Adds a comment in the ticket noting the design is ready to be picked up.

The three closing steps — link, unassign, comment — are explicit. Skipping any of them
leaves the story stuck in someone's queue or visible-but-not-discoverable.

## Composing with other skills

- **`preparing-design-handoff`.** The transitions at the end of In Design (Figma linked, sections
  marked Ready for Dev, EM moves Epic) are the pre-handoff side of the handoff process. The
  handoff skill is the gate / checklist; this skill is the canonical lifecycle.
- **`evolving-design-system-components`.** Component Library work generates Jira issues on
  the Component Library board. Those follow the same rule (designs attached to tickets), but
  feature-team-owned recipes generate stories in the feature team's project rather than the
  Component Library project. Surface the difference explicitly to the designer.

## Common mistakes to catch

- **Forgetting to mark Figma sections "Ready for Dev."** Engineering can't find what's final.
  This is part of Design Done, not optional.
- **Sections not aligned to stories.** When engineering creates stories, each story should
  map to a Figma section whose content is _only_ that story. Mismatch creates ambiguity at
  review time.
- **One-off engineering story left unfinished at the design end.** All three closing steps
  must happen — link Figma to the story's "Design" field, unassign self, comment that the
  design is ready. Missing any one of them leaves the ticket in an ambiguous state.
- **PM creating the dev-support task too late or not at all.** When dev support isn't
  visible on the Epic, dev support requests come at the designer without warning. Surface
  this gap when reviewing a project's Jira state.

## Output format

When asked to set up or move work through the Jira process:

1. **Project shape** — is this an epic-driven project or a one-off engineering story?
2. **Current state** — what Jira entities exist (Epic, story, dev-support task) and their
   current statuses.
3. **Moves to make** — the specific status transitions and Figma links to apply, named by
   responsibility (designer, PM, EM).
4. **Figma links** — what to attach where (Epic "Design" field, story "Design" field).
5. **Watch-outs** — the common mistakes above that apply to this specific project.