Structured meeting summarization that captures decisions, action items, and open questions in a consistent format.
What this skill does
# Meeting Summary Expert
## Overview
Transform meeting notes, transcripts, or recordings into clear, actionable summaries. Every summary follows a consistent structure that makes it easy for attendees and non-attendees alike to understand what was discussed, what was decided, and who is doing what by when.
### When to Use
- **After any meeting** where decisions were made or actions were assigned.
- **Sprint ceremonies** -- planning, retro, backlog refinement, sprint review.
- **Stakeholder meetings** -- steering committees, executive reviews, client calls.
- **Ad-hoc discussions** -- when an impromptu conversation produces commitments that need tracking.
## Methodology
### Step 1: Capture Meeting Metadata
Record the essential context:
| Field | Description |
|-------|-------------|
| **Date** | Meeting date (YYYY-MM-DD) |
| **Time** | Start and end time with timezone |
| **Participants** | Names and roles (e.g., "Sarah Chen, Product Lead") |
| **Topic** | One-line meeting purpose |
| **Location** | Room name, video link, or "async" |
### Step 2: Extract Key Discussion Points
From the raw notes or transcript, identify the substantive topics discussed. Guidelines:
- **Summarize, do not transcribe.** Capture the essence of each topic in 1-3 bullet points.
- **Use plain language.** Avoid jargon. Anyone reading the summary should understand the points without having attended.
- **Focus on what matters.** Skip small talk, repeated points, and tangential discussions.
- **Note disagreements.** If there was significant debate, capture the key positions and how they were resolved (or not).
### Step 3: Extract Action Items
Every action item must answer three questions:
1. **Who** is responsible? (Single owner, not a team)
2. **What** specifically must they do? (Concrete, observable deliverable)
3. **By when?** (Specific date, not "soon" or "next sprint")
Format as a table:
| Due Date | Owner | Action |
|----------|-------|--------|
| 2026-03-10 | Sarah Chen | Share revised wireframes with the design team |
| 2026-03-07 | James Park | Schedule load test for the staging environment |
**Action item quality checks:**
- Each action has exactly one owner (not "Sarah and James")
- The deliverable is specific enough to verify completion
- The due date is a calendar date, not a relative timeframe
- Actions use active verbs: "share," "schedule," "draft," "review," "decide"
### Step 4: Record Decisions
List each decision made during the meeting as a numbered item. Include enough context that someone who was not present understands the decision and its rationale.
**Format:**
1. **[Decision]** -- [Brief rationale or context]. Decided by [who].
2. **[Decision]** -- [Brief rationale or context]. Decided by [who].
**Examples:**
1. **Launch date set for April 15** -- Allows two full sprints for QA after feature freeze on March 28. Decided by steering committee.
2. **Use PostgreSQL instead of MongoDB for the analytics service** -- Team consensus based on query pattern analysis showing 80% relational queries. Decided by engineering leads.
### Step 5: Capture Open Questions
List unresolved questions that need follow-up. For each question, note who is expected to provide an answer and by when, if known.
1. Do we need a separate staging environment for the new analytics service? (James to investigate by March 10)
2. What is the budget ceiling for the Q2 marketing campaign? (Pending finance review)
### Step 6: Save and Distribute
**File naming convention:** `Meeting-Summary-[YYYY-MM-DD]-[topic-slug].md`
Examples:
- `Meeting-Summary-2026-03-04-sprint-planning.md`
- `Meeting-Summary-2026-03-04-q2-roadmap-review.md`
**Distribution:**
- Share the summary within 24 hours of the meeting.
- Send to all participants and relevant stakeholders who were not present.
- Store in the team's shared documentation space (Confluence, Notion, shared drive).
## Output Template
```markdown
# Meeting Summary
## Metadata
| Field | Value |
|-------|-------|
| **Date** | [YYYY-MM-DD] |
| **Time** | [HH:MM] - [HH:MM] [TZ] |
| **Participants** | [Name, Role]; [Name, Role]; ... |
| **Topic** | [One-line meeting purpose] |
## Summary
- [Key discussion point 1]
- [Key discussion point 2]
- [Key discussion point 3]
## Action Items
| Due Date | Owner | Action |
|----------|-------|--------|
| [YYYY-MM-DD] | [Name] | [Specific, verifiable action] |
## Decisions Made
1. **[Decision]** -- [Rationale]. Decided by [who].
## Open Questions
1. [Question]? ([Who is expected to answer, by when])
```
## What to Focus On
When summarizing, prioritize:
- **Decisions that affect roadmap or strategy** -- These have the broadest impact and are most likely to be referenced later.
- **Who does what by when** -- Accountability is the primary value of a meeting summary.
- **Blockers and risks surfaced** -- These need visibility beyond the meeting room.
- **Changes to previously agreed plans** -- These create confusion if not documented.
When summarizing, deprioritize:
- Status updates that are available elsewhere (Jira, dashboards)
- Repetition of information already documented
- Social conversation and small talk
- Detailed technical discussions better captured in design docs
## Integration with Other Skills
- Feed decisions into `wwas/` to create backlog items with strategic context.
- Use action items to create tickets via `../jira-expert/`.
- Document recurring meeting outcomes in `../confluence-expert/` templates.
## References
- See `references/meeting-facilitation-guide.md` for meeting types, note-taking strategies, and anti-patterns.
- See `assets/meeting_summary_template.md` for ready-to-use templates.
## Troubleshooting
| Problem | Likely Cause | Resolution |
|---------|-------------|------------|
| Action items are assigned to teams instead of individuals | Culture avoids individual accountability; facilitator does not press for a single owner | Enforce the "one owner" rule during the meeting; if a team is named, ask "Who on that team is the single point of contact?" |
| Summaries are too long and nobody reads them | Summarizer includes too much detail; tries to capture everything | Apply the "would someone who missed the meeting need this?" filter to every bullet point; target 1 page maximum for 1-hour meetings |
| Decisions are not documented, leading to re-litigation in future meetings | Meeting moved quickly; facilitator focused on discussion, not decisions | Pause after each decision and state it aloud: "Let me confirm: we decided X because Y"; add decision capture as a facilitator checklist item |
| Action items have vague due dates ("soon", "next sprint") | Facilitator does not push for specificity; team uncomfortable committing to dates | Require a calendar date for every action; if the team cannot commit, set a date to decide the date |
| Summaries are distributed days after the meeting | Summarizer is overburdened or perfectionist | Set a 24-hour distribution rule; use a structured template to reduce writing effort; assign summary responsibility before the meeting |
| Open questions from previous meetings are never resolved | No follow-up mechanism; questions captured but not tracked | Add "Previous Open Questions" as a standing agenda item; assign each question an owner and a resolution date |
| Attendees disagree with the summary after distribution | Summary reflects summarizer's interpretation, not group consensus | Share key decisions and action items verbally at the meeting close; invite corrections within 24 hours of distribution |
## Success Criteria
- 100% of meetings with decisions or action items produce a written summary within 24 hours
- Every action item has a single named owner and a specific calendar due date
- Action item completion rate exceeds 80% by the stated due date
- Summaries are 1 page or less for meetings under 1 hour
- Decisions are documented with enough context that a non-attendee can understand the rationale
- Open questions frRelated in General
modeling-omnistudio-epc-catalog
IncludedSalesforce Industries CME EPC product-modeling skill for Product2-based catalog creation. Use when creating EPC products, configuring product attributes, building offer bundles with Product Child Items, or reviewing EPC DataPack JSON metadata for product catalog changes. TRIGGER when: user creates or updates Product2 EPC records, AttributeAssignment payloads, AttributeMetadata/AttributeDefaultValues, Offer bundles, or ProductChildItem relationships. DO NOT TRIGGER when: designing OmniScripts/FlexCards/Integration Procedures (use building-omnistudio-omniscript, building-omnistudio-flexcard, or building-omnistudio-integration-procedure), implementing Apex business logic (use generating-apex), or troubleshooting deployment pipelines (use deploying-metadata).
relationship-science-coach
IncludedUse this skill for direct, practical adult relationship coaching: couples conflict, repair, trust, marriage, dating, flirting, attachment patterns, emotional connection, sex, desire differences, eroticism, kink negotiation, affection, love languages, breakups, and long-term passion. Draw on Gottman, EFT and Hold Me Tight, attachment science, modern sex research, Perel, Nagoski, Kerner, Schnarch, Love and Stosny, and flexible love-language tools. Be concrete and low-hedge. Redirect only for imminent danger, abuse, coercive control, minors, non-consent, self-harm, stalking, or medical/legal/psychiatric decisions.
building-sf-integrations
IncludedSalesforce integration architecture and runtime plumbing with 120-point scoring. Use this skill to set up Named Credentials, External Credentials, External Services, REST/SOAP callout patterns, Platform Events, and Change Data Capture. TRIGGER when: user sets up Named Credentials, External Services, REST/SOAP callouts, Platform Events, CDC, or touches .namedCredential-meta.xml files. DO NOT TRIGGER when: Connected App/OAuth config (use configuring-connected-apps), Apex-only logic (use generating-apex), or data import/export (use handling-sf-data).
venue-templates
IncludedAccess comprehensive LaTeX templates, formatting requirements, and submission guidelines for major scientific publication venues (Nature, Science, PLOS, IEEE, ACM), academic conferences (NeurIPS, ICML, CVPR, CHI), research posters, and grant proposals (NSF, NIH, DOE, DARPA). This skill should be used when preparing manuscripts for journal submission, conference papers, research posters, or grant proposals and need venue-specific formatting requirements and templates.
let-fate-decide
IncludedDraws the 12 Houses of the Zodiac Tarot spread to inject entropy into planning when prompts are vague, ambiguous, or casually delegated. Interprets the spread to guide next steps. Use when the user says 'let fate decide', 'YOLO', 'whatever', 'idk', or other nonchalant phrases, makes Yu-Gi-Oh references, or when you are about to arbitrarily pick between multiple reasonable approaches. Prefer over ask-questions-if-underspecified when the user's tone is casual or playful rather than precision-seeking.
net-ops
IncludedCross-platform network troubleshooting (Windows, macOS, Linux) via local or remote shell. Use for: DNS broken, can't resolve hostnames, nslookup/dig works but apps fail, NRPT, WFP, scutil, /etc/resolver, systemd-resolved, /etc/resolv.conf, NetworkManager, VPN DNS leak residue (ProtonVPN/Mullvad/WireGuard/AnyConnect), AV/firewall blocking DNS or DoH, Tailscale DNS interaction, intermittent connectivity, remote diagnostics over SSH.